MSBTE K Scheme Surveying (312339) Manual Answer
Hello, students welcome to our site, in this blog post we are going to share a surveying manual answer with you that will help you to complete your practical work quickly.
But before that let's discuss the importance of this lab manual. Today's globalized world has witnessed tremendous technological breakthroughs in surveying equipment and technology. Currently, available accurate digital surveying tools are employed because of their speed, precision, and ease of use. The disciplines of civil engineering,
mining engineering, environmental engineering, transportation engineering, and marine engineering heavily rely on these tools and applications. Given the significance of remote sensing and Geographic Information Systems (GIS) and their widespread use in mapping and storing spatial data, it is expected that students will have a basic understanding of these subjects to use them in the field. Students who finish this course will have the necessary abilities and competencies to perform tasks linked to surveys.
Surveying (312339) Manual Answer List
Pr. No | Title of the Practical | Solution |
01 | *Measure the distance between two intervisible survey stations using chain, tape, and ranging rods | Answer |
02 | *Determine the area of open field using chain and cross staff survey. | Answer |
03 | Determine the area of an irregular field using a Digital Planimeter. | Answer |
04 | *Measure Fore Bearing and Back Bearing of survey lines of open traverse using Prismatic Compass | Answer |
05 | *Measure The Bearing and back bearing of a closed traverse of 5 to 6 sides and correct the bearings and included angles. | Answer |
06 | Measure Horizontal angle by using Transit Theodolite by Direct Method | Answer |
07 | *Measure Horizontal angle by using Transit Theodolite by method of Repetition. | Answer |
08 | *Measure vertical angle using Transit Theodolite | Answer |
09 | *Project 01:-Use transit theodolite to carry out the Survey Project for closed traverse for a minimum of 5 sides (Compulsory). | Answer |
10 | *Determine Reduced Level by Height of Instrument Method. | Answer |
11 | *Determine Reduced Level by Rise and Fall Method. | Answer |
12 | *Perform Fly Levelling to check leveling work. | Answer |
13 | *Project 02 :-Profile leveling and cross-sectioning for a road length of 300 m with cross-section at 20 m intervals. (Compulsory). | Answer |
14 | Undertake differential leveling by using dumpy level/Auto Level and leveling staff for installation of irrigation pipelines. | Answer |
15 | Prepare a Contour Plan/map using Block Contouring for the area of 40m x 40m to draw its contour plan. | Answer |
16 | Project 03: Plotting contour map using block contouring method for a block of 150m x 150m with a grid of 10m x 10m for a given land parcel. (Compulsory). | Answer |
17 | Prepare a Contour plan for control farming using the block contouring method. | Answer |
18 | *Prepare plans and locate details by using the Radiation Method. | Answer |
19 | Prepare plans and locate details by Intersection Method. | Answer |
20 | *Prepare traverse using Transit Theodolite. | Answer |
21 | Prepare a plan to establish a plant nursery. | Answer |
Conclusion
By using this information you can easily solve the MSBTE K Scheme Surveying (312339) Manual.